Entries by admin

Fabricated Stair Frames

We are currently manufacturing box sections as part of a Stair assembly for a Reservoir. The frame is manufactured out of 150×150 RHS, hot dip galvanised and then delivered and installed at the customers site. Who is Better Engineering? Better Engineering has been servicing the South-East Queensland market under the same ownership for over 25 […]

Plant and Equipment Repairs

Plant and Equipment Repairs on Pile Drilling Equipment were recently carried out by us.. The Machine was damaged and required repairs. We replaced a rolled steel plate section of the bottom frame along with repairing or replacing mount brackets and cover plates. To allow the repair, we had to remove necessary hydraulic hoses and electrical […]

Steel Fabrication and Repairs

Here at Better Engineering, we specialise in steel fabrication and repairs. We recently fabricated a large top section for a sand bin for a manufacturing plant. It was manufactured from carbon steel, and fabrication included a rolled cylinder, lifting lugs, inspection point and machined flange for pipe connection. After manufacturing, the unit was sandblasted and […]

Steel Steps

We recently completed the manufacture of a set of Steel Steps and handrails. This photo was when the Steps were nearing completion in our factory and before they were transported to our customer. Contact the team at Better Engineering if you need a price. We can look at your drawings, or suggest a design. Who […]

Stainless Steel Fabrication

We recently completed a complex Stainless Steel Fabrication project for a large Pump Supply company. The job was the manufacture of a Discharge pipe, which was to be cast into concrete. At the base of the discharge pipe is attached a large submersible pump. The pipe work was manufactured form 316 Grade Stainless Steel. Wall […]

Footing Reinforcing Cage

We work with Telecommunication Infrastructure providers on a range of projects across Queensland. Here, we are featuring a Footing Reinforcing Cage that was installed as part of the footings in a Telecommunications Tower. The reinforcing cage was fabricated from deformed reinforcing bar for the frame. The cage included a hold down bolt cage using machined […]